Reconstruction of the Royal School Petrovice

Realisation date

2 months (summer holidays)

Building

Bellova 352, Prague 10 – Petrovice 109 00

Client

Royal School Petrovice

Area

490 m2

What was our team tasked with?

Reconstruction and modernization of selected school premises in Prague 10.


How did we deal with it?

School Renovation During the Summer Holidays

During the summer holidays, we renovated selected areas of a school in Prague 10. The goal was to modernize the interiors so that students and teachers would find a clean, safe, and inspiring learning environment in September. Thanks to careful planning and coordination of all work, we managed to complete the project on time without disrupting school classes.

Modern spaces for comfortable learning

The renovation included the assembly room, principal’s office, entrance hall, reception, chill out area, staircase and hallway. As part of the work, we focused on the ceilings, walls and floors to give the spaces a uniform and modern look. We treated the ceilings and walls with sprayed surfaces, which give the rooms a clean and timeless character. We covered the floors with epoxy cast screeds, which combine aesthetics with durability and easy maintenance, ideal for everyday school operations.

Functionality and comfort in every detail

We integrated acoustic panels into the space, which serve not only as a visual element but also as an improvement in sound comfort. We also implemented the reception desk, lighting fixtures and a complete reconstruction of the staircase, which has become the dominant element of the school interior. Every detail was thought out to support the comfort of teachers and students and contribute to a pleasant learning environment.

Furniture and equipment ready for students

The renovation also included the delivery of new furniture – cabinets, tables, chairs and comfortable seats. Everything was chosen to match the modern interior design and at the same time meet the demands of everyday school operations. Thanks to the completion of all work exactly according to plan, students were able to return to school in September in completely renovated premises, ready for inspiring and high-quality teaching.